top of page

Unit 1: Safety Review 

Unit 2: Wood ID 

  • Safety Review

    • Topics 

      • General Shop safety

      • Machine Safety 

    • Notes = 5 pts 

    • Board Assignment #1 = 15 pts 

      • Part 1= 5 pts  - Create a Portfolio Cover that has your Name, Class, 1 Safety Rule, and at least 2 colors. Draw your safety rule . 

      • Part 2 = 10 pts - Draw and label the parts of a table saw. 

  • Safety Review

    • Topics

      • Shop Attire 

      • Work Stations 

      • Parts Review 

    • Notes = 5 pts​

    • Board Assignment #2 = 15 pts 

      • Part 1 = 5 pts - Draw and label the parts of a lathe

      • Part 2 = 10 pts - Make a list of 35 different machine rules to the following machines: table saw, planer, radial arm saw, miter saw, jointer, panel saw, and lathe.  â€‹

  • Safety Review 

    • Test Review 

      • Finger Rules

      • Safety Test Review 

      • Notes = 5 pts 

    • Shop Pictionary = 2 pts EC to be used on any test EXCEPT the final

  • ​Intermediate Safety Test

    • ​Click the button to go to the Safety Test Page

  • Wood Identification 

    • Lumber Grades

      • Hardwoods​

      • Softwoods

      • Sheet Goods

      • Quarter System 

    • ​Notes = 5 pts 

    • Board Assignment #3 = 20 pts 

      • Read pages 48, 49, 50, 56, and 57 in the WB

      • Make an outline of the pages, provide examples and specific Key points

    • Cube Project â€‹

  • ​Wood Identification 

    • Start PowerPoint

    • ​Notes = 5 pts 

    • ​Board Assignment #4 = 13 pts 

      • Read chapter 1 take notes (1/2 page) and complete the 7 questions in the back of the chapter. â€‹

    • Cube Project â€‹

  • ​Wood Identification 

    • PowerPoint â€‹

      • Materials

      • Industry Use 

    • Notes = 5 pts 

    • Board Assignment #5 = 10 pts

      • Identify the 10 different types of wood. 

    • Cube Project â€‹

  • Wood Identification 

    • Review 

    • Questions = 20 pts

    • Cube Project

  • Wood Identification 

    • ​Exam = 50 pts 

      • Be able to identify different wood species

      • Be able to fill out a plant kingdom chart

      • Be able to classify lumber grades

    • ​Cube Project due 

Unit 3: Cabinets 
Unit 4: Table Projects
Unit 5: Sharpening
Unit 6: Carving Machine 
Unit 7: Trivit Project
  • Cabinets

    • PowerPoint

    • Notes = 5 pts

    • Board Assignment #6 = 10 pts

      • Read Kitchen Planning Packet 

  • Cabinets â€‹

    • Review Kitchen Planning Packet 

    • Metric System 

    • Parts of a Cabinet 

      • Uppers​

      • Bases

    • ​Notes = 5 pts 

    • Board Assignment # 7 = 10 pts  

      • Draw and Label the parts of a base and upper cabinet 

    • Work on Cabinet Worksheet packet. â€‹

  • ​Cabinets 

    • Review Cabinet Plans 

    • Discuss Cabinet Construction 

    • Finish Cabinet Work sheet packets

  •  Cabinets 

    • ​Assign Groups 

    • Plan order

  • Cabinets

    • BOMs Due = 10 pts 

    • Develop Cut list

    • Homework #1​​

      • Build a 20 step POD for cabinet construction â€‹

  • Cabinets

    • Develop a POD

  • Cabinets: Box Construction 

    • Break out material

    • Layout

    • Joints

    • Glue up #1

  • Cabinets: Doors

    •  Parts

    • Joints
    • Door Math​
    • Board Assignment #8 = 15 pts 
      • Complete Door construction work sheet â€‹
  • Cabinets: Doors 

    • Breakout​

    • Layout 

    • Cutting joints

      • Notes = 5 pts​

    • Glue up #2​​​

  • Cabinets: Edge banding â€‹

    • Definition 

    • Demo 

    • Notes = 5 pts 

  • Cabinets: Sanding â€‹

  • Cabinets: Finishing â€‹â€‹

  • Cabinets: Review 

    • Parts​

    • Process

    • Doors

    • Edge Banding 

    • Finishing 

  • Cabinets: Exam = 150 pts â€‹

  • Cabinets Due = 200 pts 

Anchor 1
Anchor 2
  • Tables   

    • ​Review Plans

    • Discuss Parts 

    • Discuss Joints Used

    • Discuss Material 

    • ​Notes = 5 pts 

    • Board Assignment #9= 10 pts

      • Complete a BOM for the table frame and drawer 

    • Homework #2​

      • Complete a POD with at least 20 steps for building the table. â€‹â€‹â€‹

  • Tables​​

    • Develop a POD​

    • Notes = 5 pts 

  • Tables​

    • Develop a Cut List â€‹

    • Assign Groups 

    • Notes = 5 pts 

  • Tables: Construction â€‹

    • Break out â€‹

    • Lay out

    • Leg Glue up

      • Notes = 5 pts​

    • Mortise Demo​

      • Notes = 5 pts â€‹

    • Tenon Demo​

      • Notes = 5 pts â€‹

  • Table: The Domino

    • Parts

    • Applications

    • Safety

    • Notes = 5 pts 

  • Table: The Domino â€‹

    • Demo 

    • Set up 

    • Changing Bits 

    • Notes = 5 pts 

  • Table: The Domino​

    • Reveiw â€‹

      • Parts​

      • Safety

      • Set up 

    • Work on table construction â€‹

  • Table: The Domino Safety Test​ = 25 pts â€‹

  • Table: construction 

    • Inside Aprons​

      • Joint Demos = 3 â€‹

      • notes = 15 pts 

    • Guide Rails

      • Notes = 5 pts â€‹

    • Leg shaping â€‹

      • Notes = 5 pts â€‹

    • Glue Up #1​

      • Notes = 5 pts â€‹

    • Glue Up #2 â€‹

      • Notes = 5 pts

    • Table Top â€‹â€‹

  • Table: Drawer

    •  â€‹Parts

    • Joints

    • Review Plans

    • Homework #3

      • Develop a POD for the drawer â€‹â€‹

  • Table: Drawer â€‹â€‹

    • Develop POD​

    • Develop Cut List 

  • Table: Drawer â€‹

    • Break out​

    • Lay out 

    • Dovetails

      • Notes = 5 pts​

    • Bottom â€‹

      • Notes = 5 pts​

    • Tuning a Knob​​​

      • Notes = 5 pts​

    • Guide Rails â€‹â€‹â€‹

      • Notes = 5 pts​

    • False Front â€‹â€‹â€‹

      • Notes = 5 pts â€‹

  • Table: Sanding​​

  • Table: Finishing â€‹â€‹

  • Table Project Review 

    • ​Parts
    • Processes
    • Joints
  • ​Table Project Test = 70 pts
  • Table Project Due = 150 pts 
Anchor 3
Anchor 4
  • Sharpening 

    • Topics

      • Grinder wheels â€‹

      • Water Stones

    • Safety â€‹

    • Notes = 5 pts 

    • Work sheet = 10 pts 

  • Sharpening â€‹

    • Demo​

    • Notes = 5 pts 

    • Borad Assignment #10 = 10 pts

      • Sharpen a chisel â€‹

  • Sharpening Review​​

    • Grinders​

    • Stones

    • Safety 

  • Sharpening Quiz = 25 pts â€‹â€‹

    • Click the safety test button to take the sharpening q​uiz. 

Anchor 5
  • Carving Machine   

    • Watch Screencast of CarveWright Machine​

    • Homework #4 = 5 pts 

      • Read CarveWright packet and highlight important parts. â€‹â€‹

  • Carving Machine â€‹â€‹

    • Board Assignment #11

      • Draw and label the parts of a carving machine​

    • Demo â€‹

    • Notes = 5 pts 

  • Carving Machine Project â€‹

    • Discussion â€‹

    • Outlines 

  • Carving Machine Review​

    • Parts​

    • Safety 

    • Operation

  • Carving Machine Test â€‹= 25 pts 

    • Go to the safety test button to take the safety test. 

    • Carving Project Due at the end of unit 7. 
      •  

  • Trvit Project  

    • Review Plans in class. 

    • Homework #5 

      • Complete a POD for the trivit. â€‹

      • At least 25 steps 

  • Trivit Project â€‹â€‹

    • Research heat resistant finishes â€‹

    • Board Assignment #12

      • Write a 1/2 short essay explaining your findings on heat resistant finish.

    • Complete all paperwork​

      • POD​

      • BOM

      • Cut List 

  • Trivit Project â€‹â€‹

    • Break out material â€‹

    • Lay out 

    • Project contruction 

      • Demos will be given as needed​

  • Trivit Project Due.​​

  • Table Project Due 

  • Carveing Project Due 

Anchor 6
Anchor 7
Unit 8: Research
  • Research   

    • ​Topics

      • Importance of Research in Woodworking 

      • Types of Research 

      • Careers

    • Notes = 5 pts​

    • Assign Career Research Project 

  • Research​

    • Discuss Different Careers​

    • Notes = 5 tps 
  • Research â€‹
    • In class time for students to complete reseach project â€‹
    • Students will have to complete so out of class work in order to complete this project 
  • Research Presentations â€‹
    • To be done as a group each individual is responsible for asking questions related to each presenters topics. â€‹
    • Total Project = 140 pts 
Anchor 8

Units for the CMM 2 Class are suggestive. The work overlaps the units. Unit order is not always followed. 

bottom of page